
Proper selection and installation of steam traps can prevent freezing as long as there is steam passing through. However, if the steam supply is interrupted, the condensate in the heat exchanger or tracing pipe will create a vacuum, which will prevent the condensate from freely draining from the system before freezing occurs. Therefore, a vacuum breaker should be installed between the equipment to be drained and the steam trap. If the condensate is not drained by gravity from the steam trap to the return pipe, the steam trap and the drainage pipe should be manually drained or automatically drained using a return pipe with anti-freezing measures. Additionally, when multiple steam traps are installed in a steam trap station, insulating the steam traps can prevent freezing.
Anti-freezing measures for steam traps include:
1. Do not select steam traps that are too large in size.
2. Keep the drainage pipe of the steam trap as short as possible.
3. Slope the drainage pipe of the steam trap downward to increase the speed of gravity drainage.
4. Insulate the drainage pipe of the steam trap and the condensate return pipe.
5. When the condensate return pipe is exposed to the atmosphere, consider adding a heating trace.
6. If the return pipe is elevated, the vertical drainage pipe should be adjacent to the upper drainage pipe of the return header, and both the drainage pipe and the steam trap drainage pipe should be insulated.
感谢您访问我们的网站,您可能还对以下资源感兴趣:
亚洲一区二区精品成人_上海少妇69式偷拍HD_国产精品人妻无码久久青草_极品少妇毛片在线观看_又粗又大又爽a片免费看天美集团_午夜久久精品网站_亚洲美女内射视频在线观看_美女解开胸衣露出奶头_公和我做好爽添厨房在线观看_无码人妻一区二区三区免费看